The main element of technical soft landscape information is the planting plan, but when preparing a package of information for construction, this should be backed up by 1:50/1:20/1:10 technical sectional and plan drawings, NBS specifications, and a clear and measured schedule of works.
We are able to provide robust and coordinated sets of soft landscape technical information to ensure that the scheme is constructed in line with the original design intent.